California Solar Farm Gets LEED Gold | GetSolar.com Blog

getsolar.com/blog/california-solar-farm-gets-leed-gold/3480/ view page cached page
A 1 MW Ventura, California solar farm has received LEED gold certification. There are 6,400 solar panels at this California solar installation., Limoneira Company's 5.5 acre, 6,400 solar panel, 1 megawatt capacity solar orchard--complete with observation deck--was designed to meet the rigorous ...


All posts about this link

  • share this page on Twitter
  • rss feed for getsolar.com
  • alerts create email alert for getsolar.com
Copy and paste this code below into your website:
customize »